Call Now! +61 (0)412 472 807 | Get a Quote! info@nationalsafetyproducts.com.au
HomeCategory

LowPro 15/10 Driveway Board

SKU:
NSP0815
$
A$ 0.01 AUD
Get Quote

This product has been designed to support a load of one wheel of a 3.5t vehicle, over a 900mm span, & to use the LowPro technology. In most site configurations the product will not need to be fixed in place which reduces installation time and reduce costs of reinstatement, reducing the need to use steel plates in driveway applications.

The increased loading and design also enables the product to be used in pedestrian applications that require a span up to 1200mm. The new design, developed in collaboration with Utilities and Contractors alike, provides a single product that works in multiple applications.

Complies with Australian Standard 3996 and 1428

Award-winning, 2 person-lift Driveway Board

Suitable for 3.5T vehicles over a 900mm trench & pedestrians over a 1200mm trench

LowPro edges grip the asphalt –pinning not required in most applications

Moulded anti-slip surface

Fitted with gas vents & probe hole

Shock resistant

Use with LowPro Infill to remove trip-hazards

Corporate branding available

Designed & manufactured in the UK

Related Products
Description

Testimonials

"We work closely with SA Water and are often excavating into the road to replace pipes, so time on site is critical as is ensuring we do not delay traffic too long. We purchased The National Safety Product Road Plates and have been very happy with the ease of use, the extra safety benefits and the time we save with set up and pack up daily. We highly recommend these road plates to anyone working in the road."

Mark Miller, Director, Fleurieu Civil

"We have been using the Road Plates, we had our guys try them and they were pretty successful, they actually asked for some more, they were that keen on them. Certainly, they have been ideal for our situation. We lay gas for APA Group; inlets, mains extensions, all types of gas work. The main benefit of the Road Plate is that it saves time: time with backfilling, digging up, it saves time every morning. They have been a real winner for us."

Steve Minear, Safety Manager, Seychell Constructions